Project Consultancy

The purpose of engineering consultation is to give customers an overall concept of their own concentrator, including mine value, useful mineral elements, available beneficiation technology, beneficiation plant scale, required equipment, approximate construction period, etc. The customer basically knows it.

Beneficiation Test

The beneficiation experiment includes:

Preparatory work before the test: The beneficiation test first requires the customer to provide a representative sample of about 50kg, and some special mineral samples need about 200-1000kg. In terms of test time, a simple and easy beneficiation test takes about 30 working days, and a detailed beneficiation test takes about half a year.

Test process: First, the material composition (ore structure, ore mineral, ore type) and chemical properties of the raw ore (multi-element raw ore, raw ore particle size screening, raw ore density, and relative grindability of the raw ore) are carried out by the laboratory of the Mineral Processing Research Institute Determined to obtain a series of relevant data to provide a basis for subsequent beneficiation tests.

Test results: After all the test work is completed, the beneficiation laboratory will summarize the test process and give a detailed "mineral beneficiation test report". At the end of the "Mineral Processing Test Report", the best process flow and process parameters will be given.

imgboxbg
Zhaoyuan Gold Machine General Factory Co., Ltd

Beneficiation Design

The most important point of the beneficiation design is that all its work must be based on a detailed field survey. Therefore, the beneficiation design institute will first conduct a comprehensive field survey of the customer’s mine, including the raw ore supply of the concentrator, the site, water and electricity, Transportation, geography, etc.

Equipment Manufacturing

The manufacture of equipment is an indispensable part of the total beneficiation package. It is a targeted design for the beneficiation plant based on the conclusions drawn from the beneficiation experiment and mine design.

Zhaoyuan Gold Machine General Factory Co., Ltd

Scan the QR code to follow the mobile website

Zhaoyuan Gold Machine General Factory Co., Ltd

CONTACT US

Add: No. 117, Wensan Road, Jinling 

        Town, Zhaoyuan City,  Yantai,

        Shandong Province, China.

Fax: +0086-535-8225348

Username used for comment:
客户留言
Description:
验证码

Zhaoyuan Gold Machine General Factory Co., Ltd

Zhaoyuan Gold Machine General Factory Co., Ltd   Copyright ©  2020 All rights reserved     Lu ICP No.18043915号-2